CommScope – Application Guide
The following guide was developed to provide some insight on pole grounds using copper clad steel (CCS) cable instead of copper, which will reduce theft.
The following guide was developed to provide some insight on pole grounds using copper clad steel (CCS) cable instead of copper, which will reduce theft.
E. Matt Bedinghaus, P.E., recently completed a training seminar on Small Wind Energy hosted by Halfmoon LLC in Branson, Missouri. The program covered a number of key concepts related to smaller wind turbine technology and the applications for small wind energy systems. Prerequisites for installing small wind energy systems were discussed as was the economics…
E. Matt Bedinghaus, PE of A2V Partners LLC, Springfield, Mo., attended the “Investigating & Documenting Accidental Public Contacts with Power & Communication Utility Facilities” seminar held June 27-30, 2011, in Myrtle Beach, South Carolina. The seminar was led by Allan Clapp, Professional Engineer (PE) of PCU Training Center/Clapp Research Inc. The seminar focused on the…
A2V Partners LLC, a professional electrical engineering firm located in Springfield, Mo., has added a new professional to its internal team. Darren Carite will serve the firm as project manager. “I’m very excited to be adding Darren to the team,” said Matt Bedinghaus, founder and Chief Engineer for A2V. “His skills are exactly what we…
On November 9th, 2011, the IEEE Chicago Section Hosted a discussion about copper theft featuring A2V Partners founder, Matt Bedinghaus. The following is an article released in their newsletter: Anyone watching the news or keeping an eye on the price of metals is aware of the growing problem of Copper Theft. The IEEE–Chicago Section’s Power…
A2V Partners LLC, a professional electrical engineering firm located in Springfield, Mo., has recently moved its operation to 1354 E. Kinglsey Street, Suite A. The new office space will allow the growing firm to add staff members to work on newly won projects. “I’m very pleased to be growing this quickly,” said Matt Bedinghaus, A2V…
Our client had a new 138kV transmission line and autotransformer being added to an existing station arranged in a breaker & ½ scheme. They needed line relaying (SEL 311L/421 protection with 451 reclosing and breaker control) to replace an existing line panel. Another two panels were added with 311L/311L & 451 relays for redundant hot-standby…